摘要
提出了一种针对装配式建筑钢管束结构体系的综合施工工序,详细介绍了预埋件的安装、钢管束和钢框架的吊装、钢管束以及钢框架的吊装等7个工序,解决了传统施工中的对齐误差、结构稳定性和连接质量的问题,实现了更加快速、准确的装配式建筑钢管束结构体系施工,确保了工程质量和施工安全性。
A comprehensive construction process for prefabricated building steel pipe bundle structure system is proposed.The seven processes,such as installation of embedded parts,lifting of steel pipe bundle and steel frame,lifting of steel pipe bundle and steel frame,are introduced detailedly the problems of alignment error,structural stability and connection quality in traditional construction are solved,and the construction of prefabricated building steel pipe bundle structure system is realized more quickly and accurately,the quality of the project and construction safety is ensured.
作者
崔学龙
王仕军
邹子伟
CUI Xue-long;WANG Shi-jun;ZOU Zi-wei(China Construction Fifth Engineering Bureau Co.Ltd.,Yantai 264600,China)
出处
《工程建设与设计》
2024年第20期151-153,共3页
Construction & Design for Engineering
关键词
装配式建筑
钢管束结构
工艺原理
施工工序
prefabricated building
steel pipe bundle structure
process principle
construction process