某市政道路混凝土箱形涵洞施工技术

Construction Technology of Concrete Box Culvert on a Municipal Road
下载PDF
导出
摘要 为探究某市政道路混凝土箱形涵洞施工技术,首先,提出了混凝土箱形涵洞总体施工方案,主要包括前期准备工作、箱形涵洞施工和收尾工作3大内容;其次,对箱形涵洞施工总体施工方案中的关键施工工序进行了论述;最后,为确保混凝土箱形涵洞施工质量,提出了箱形涵洞施工质量控制要点和箱形涵洞基础混凝土质量检测容许值。 In order to explore the construction technology of concrete box culvert on a municipal road,the overall construction scheme of concrete box culvert is first proposed,which mainly includes three major contents:preliminary preparation work,box culvert construction and finishing work.Secondly,the key construction procedures in the overall construction scheme of box culvert construction are discussed.Finally,in order to ensure the construction quality of concrete box culvert construction,the key points of construction quality control of box culvert and the allowable value of concrete quality inspection of box culvert foundation are put forward.
作者 孙昊 陈凯然 李建 梁坤 李岩 SUN Hao;CHEN Kai-ran;LI Jian;LIANG Kun;LI Yan(The First Construction Engineering Company Ltd.of China Construction Second Engineering Bureau,Beijing 100176,China)
出处 《工程建设与设计》 2024年第20期178-180,共3页 Construction & Design for Engineering
关键词 市政道路 箱形涵洞 施工技术 municipal road box culvert construction technique
  • 相关文献

参考文献4

二级参考文献8

共引文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部