建设征地移民安置是抽水蓄能电站建设的一项重要内容。抽水蓄能电站能否高质量地建设好,建设征地移民安置工作是基础。由于抽水蓄能电站建设征地移民安置有其独有的特点,因此在建设征地移民安置规划设计和实施管理时需要有针对性的应对措施。笔者通过对抽水蓄能电站建设征地移民安置的特点进行分析,提出在建设征地移民安置规划设计与实施管理阶段应重点做好的工作以及需重点关注的问题,可为类似工程建设提供借鉴。
The land acquisition and resettlement is an important part of the construction of pumped storage power stations.Whether the pumped storage power station can be well constructed with high quality is based on the construction of land requisition resettlement.Due to the unique characteristics of land acquisition and resettlement in the construction of pumped storage power station,targeted countermeasures are needed in the planning,design and implementation management of land acquisition and resettlement.Based on the analysis of the characteristics of land acquisition and resettlement in the construction of pumped storage power station,the authors put forward the work that should be done well and the problems that need to be paid attention to in the planning,design and implementation management of land acquisition and resettlement,which can provide reference for similar engineering construction.
作者
潘秀庭
郑寿春
PAN Xiuting;ZHENG Shouchun(China Energy Engineering Group Guangxi Electric Power Design Institute Co.,Ltd.,Nanning 530007,China)
出处
《红水河》
2024年第5期83-89,114,共8页
关键词
建设征地移民安置
规划设计
实施管理
抽水蓄能电站
land acquisition and resettlement
planning and design
implementation management
pumped storage power station