期刊文献+

一种区分欠固结软土地区盾构施工地表沉降组成的实用方法

Practical Method to Judge the Ground Settlement Caused by Shield Tunnelling in Unconsolidated Soft Soil
下载PDF
导出
摘要 在欠固结软土地区中,监测所得盾构掘进引起的地表沉降相对于真实值往往偏大,导致掘进对地层的影响被高估。欠固结软土地区盾构掘进对地层扰动规律目前缺乏研究,为找到能更精确评估掘进影响的方法,文章结合实际广州某大盾构项目的地表沉降实测数据分析欠固结地层中盾构掘进引起的地表沉降规律。分析实测数据后得出以下结论,在欠固结软土地区盾构施工中,地表沉降应由盾构施工引起的沉降和地层欠固结引起的沉降两个部分组成,两个部分沉降的速率存在明显差异,利用盾构施工引起的沉降呈现槽形分布且先完成的特点,提出了“增量沉降速率槽”方法,从总沉降中有效分离出盾构施工引起的沉降和地层欠固结引起的沉降两部分。研究有助于更加准确地评价和确定盾构掘进在欠固结地层引起真实位移。 In underconsolidated soft soil areas,the surface settlement caused by shield tunnelling obtained by monitoring is frequently larger than the true value,resulting in an overestimation of the impact of tunnelling on the strata.There is currently a lack of research on the law of stratum disturbance caused by shield tunnelling in underconsolidated soft soil areas.In order to find a method that can more accu‐rately evaluate the impact of tunnelling,analyzes the law of surface settlement caused by shield tunnelling in underconsolidated strata based on the measured surface settlement data of a large shield project in Guangzhou.After analyzing the measured data,the following conclusions were drawn:in shield construction in underconsolidated soft soil areas,the surface settlement should be composed of two parts:settlement caused by shield construction and settlement caused by underconsolidation of the strata.There is a significant difference in the settlement rates of the two parts.Taking advantage of the fact that the settlement caused by shield construction presents a trough-shaped distribution and is completed first,the"incremental settlement rate trough"method is proposed to effectively separate the settlement caused by shield construc‐tion and settlement caused by underconsolidation of the strata from the total settlement.The study helps to more accurately evaluate and de‐termine the true displacement caused by shield tunnelling in underconsolidated strata.
作者 雷磊 陈春林 刘英城 谢继安 骆冠勇 潘泓 LEI Lei;CHEN Chunlin;LIU Yingcheng;XIE Ji'an;LUO Guanyong;PAN Hong(Guangzhou Metro Engineering Consulting Co.,Ltd.Guangzhou 510180,China;Guangzhou Dunjian Underground Engineering Co.,Ltd.Guangzhou 511400,China;Guangzhou Power Supply Co.,Ltd.Guangzhou 510620,China;South China University of Technology Guangzhou 510641,China)
出处 《广东土木与建筑》 2024年第10期38-42,共5页 Guangdong Architecture Civil Engineering
关键词 欠固结软土 盾构施工 地表沉降 实用方法 unconsolidated soft soil slurry shield ground settlement practical method
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部