施工场地平整成本降低方法研究

下载PDF
导出
摘要 为科学制定土方调配方案,降低工程成本和造价,首先通过方格网法计算土方工程量,然后运用运筹学中的运输问题建立模型,再运用表上作业法进行土方调配方案的优化,从而明确挖方与填方区的土方调配方向和数量,最终达到满足设计标高的同时成本最低。最后在充分考虑调配方案目标的基础上,提出相应的目标规划模型。 In order to scientifically formulate an earthwork allocation plan and reduce project costs and costs,first calculate the earthwork volume through the grid method,then use the transportation problems in operations research to establish a model,and then use the table operation method to optimize the earthwork allocation plan,thereby clarifying the direction and quantity of earthwork allocation in the excavation and fill areas,and ultimately achieve the lowest cost while meeting the design elevation.Finally,based on fully considering the goals of the deployment plan,a corresponding goal planning model is proposed.
作者 蒲涛
出处 《科技创新与应用》 2024年第33期136-140,共5页 Technology Innovation and Application
关键词 方格网法 运输问题模型 表上作业法 土方调运 目标规划 grid method transportation problem model table operation method earthworks allocation goal planning
  • 相关文献

参考文献5

二级参考文献32

共引文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部