期刊文献+

智慧城市电网电子化移交自动管控系统

Smart City Power Grid Electronic Transfer Automatic Management and Control System
下载PDF
导出
摘要 当前对不同类型电力数据无同步处理,电力数据移交任务中成功转换的次数减少,移交时间长,为此设计智慧城市电网电子化移交的自动管控系统。以服务形式向多个业务中心转移数据,控制电网电子驱动电流和电压,完成恒定功率下的快速响应,通过应答通讯电网数据移交模块回应不同电量下电网数据指令,平衡处理智慧电网电子化移交数据,构建电网神经网络信息移交模型。测试结果表明,当电力数据移交执行次数设定为500次时,所设计系统能够一次性执行成功,任务移交时间为5.2 s,而对比系统需要进行五次任务转换,所需时间分别为16.4 s和21.2 s,该系统的优势比较明显。 At present,there is no synchronous processing for different types of power data.The number of successful conversions in power data transfer tasks is reduced and the transfer time is long.Therefore,an automatic control system for electronic transfer of smart city power grid is designed.It transfers data to multiple business centers in the form of services,controls the electronic drive current and voltage of the power grid,completes the rapid response under constant power,responds to the power grid data instructions under different power levels through the response communication power grid data transfers module,balances and processes the electronic transfer data of the smart grid,and builds the power grid neural network information transfer model.The test results show that when the number of power data handover is set to 500,the system in this paper can be successfully executed at one time,and the task handover time is 5.2 s,while the comparison system needs five task conversions,and the time required is 16.4 s and 21.2 s respectively.The advantage ratio of the system in this paper is obvious.
作者 王朝硕 赵志勤 WANG Chao-shuo;ZHAO Zhi-qin(Communication Center,China Southern Power Grid Ultra High Voltage Transmission Company,Guangzhou 510663 China)
出处 《自动化技术与应用》 2024年第11期160-164,共5页 Techniques of Automation and Applications
基金 广东电网信息化项目(037800HK42190029)。
关键词 智慧城市 城市电网 自动管控 电子化移交 smart city urban power grid automatic management and control electronic transfer
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部