缆索起重机索道系统主索拆除施工新技术

New Technology for Demolition of Main Cable of Cable Crane Cableway System
下载PDF
导出
摘要 缆索起重机因其具有跨度大、施工效率高且能够在场地狭窄、岸壁陡峭的高山峡谷中应用的优点已在国内水电项目使用长达50余年。鉴于现有缆索起重机索道系统主索拆除的传统工艺存在拆除工期长、高空作业风险高的弊端,总结并开发出一种缆索起重机索道系统主索拆除施工新技术,彻底解决了主索空中作业的安全风险,省去了架设和拆除临时承载索工序和临时承码安拆工序,有效节约了缆索起重机主索拆除的施工工期,减少了临时承载索和承码保距绳等资源的投入,使得施工效率、经济效益和社会效益显著提高,具有很好的实用价值和推广借鉴意义。 The cable crane has the advantages of large span,high construction efficiency,and can be used in narrow sites and steep canyons.It has been used in domestic hydropower projects for more than 50 years.The existing cable crane cableway system of hydropower projects that uses traditional technology has the disadvantages for removing main cables,such as long demolition period and high risk of high-altitude operations.A new technology for the removal of the main cable of the cable crane ropeway system has been summarized and developed,which completely solves the safety risks of aerial operations of main cable,eliminates the process of erecting and dismantling temporary load-bearing cables and the process of installing and removing temporary bearings,effectively saves the construction period for the main cable removal and reduces the investment in resources such as temporary load-bearing cables and bearing distance ropes,and significantly improves the efficiency,economic benefits and social benefits.It has strong practical value and promotion significance.
作者 王石连 范道林 刘晓军 WANG Shilian;Fan Daolin;LIU Xiaojun(Sinohydro Bureau 7 Co.,Ltd.,Chengdu Sichuan 610213)
出处 《四川水力发电》 2024年第5期67-70,共4页 Sichuan Hydropower
关键词 亭子口水利枢纽 缆索起重机 索道系统 主索拆除 Tingzikou Water Conservancy Project Cable crane Cableway system Main cable removal
  • 相关文献

参考文献5

二级参考文献10

共引文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部