摘要
针对大型市政工程竣工测绘中普遍存在的工期紧、任务重的问题,介绍了基于多源测量、数据融合的“空地一体化”的作业模式。通过在成都市东西城市轴线东段竣工测绘的应用,梳理了各测量方式的作业流程,分析了其优缺点,总结了相关经验,并通过对1∶500地形图成果的精度分析验证了此模式的可行性。
Aiming at the problems of tight time limit and heavy task in the completed stage surveying and mapping of large-scale municipal projects,this paper introduces the operation mode of“space-ground union”based on multi-source measurement and data fusion.Through the application of completed stage surveying and mapping in the eastern section of the east-west axis in Chengdu,the operation process of each surveying method is sorted out,its advantages and disadvantages are analyzed,the relevant experience is summarized,and the feasibility of this model is verified by the accuracy analysis of 1∶500 topographic map results.
作者
余太远
马明
张全鹏
刘刚
钟继
王红改
YU Tai-yuan;MA Ming;ZHANG Quan-peng;LIU Gang;ZHONG Ji;WANG Hong-gai(Chengdu Institute of Survey and Investigation,Chengdu 610000,China;Chengdu Planning Research and Application Technology Center,Chengdu 610000,China)
出处
《工程建设与设计》
2024年第21期145-148,共4页
Construction & Design for Engineering
关键词
市政竣工测绘
多源测量数据融合
应用
精度分析
1∶500地形图
completed stage municipal surveying and mapping
multi-source measurement data fusion
application
precision analysis
1∶500 scale topographic map