实验室工程施工过程控制重点分析

Key Analysis of Laboratory Engineering Construction Process Control
下载PDF
导出
摘要 施工过程控制和调试验收是实验室工程施工阶段的控制重点,开工前应做好各专业工程施工界面划分和施工工序规划。在实验室各专业工程中,通风空调工程会直接影响实验室使用功能的实现和运行安全,因此,施工阶段应格外重视通风空调工程的施工质量和系统调试工作。 Construction process control and commissioning acceptance are the key points of control during the construction phase of laboratory engineering.Before starting work,the division of construction interfaces and construction process planning for each professional engineering should be done well.In various professional engineering projects in the laboratory,ventilation and air conditioning engineering directly affects the realization of laboratory functions and operational safety.Therefore,special attention should be paid to the construction quality and system debugging work of ventilation and air conditioning engineering during the construction phase.
作者 王威 WANG Wei(Sinosteel ZhengzhouResearch Institute ofSteel Wire Products Co.Ltd.,Zhengzhou 450001,China)
出处 《工程建设与设计》 2024年第21期251-253,共3页 Construction & Design for Engineering
关键词 实验室施工 施工过程控制 系统调试 laboratory construction construction process control system debugging
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部