FPSO坞内轮机工程施工要点分析

Analysis of key points in marine engineering construction of an FPSO in dock
下载PDF
导出
摘要 浮式生产储油船(FPSO)部分施工作业需进坞完成。由于各专业在坞内的施工工程繁杂且集中,在规定坞期内完成高精度、高强度的FPSO工程施工作业,相关生产计划制定及方案实施执行就显得尤为重要。文章通过分析某FPSO项目轮机坞内工程SLWR管及下吸入口定位安装试压施工难点和相关作业策划实施,对同类型项目坞内轮机工程施工进行了探讨,并对具体施工关键要点提出了针对性建议。 Part of the construction of floating production storage and offloading(FPSO)needs to finish in the dock.As the construction work of various specialties in the dock is complex and concentrated,it is particularly im-portant to formulate relevant production plans and implement the construction schemes to complete the high-precision and high-intensity FPSO engineering work within the specified docking period.Through the analysis of the construction dfficulties of SLWR pipe and lower suction installation and pressure test and the implementation of rel-evant operation plans during the implementation of an FPSO project in the dock,this paper discussed the construc-tion of the same type of project in the dock and put forward targeted suggestions on the key points of the specific con-struction.
作者 周亮 ZHOU Liang
出处 《中国修船》 2024年第S01期78-81,共4页 China Shiprepair
关键词 浮式生产储油船 坞内轮机工程 施工要点 floating production storage and offloading mechanical engineering construction within FPSO dock key points of construction
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部