干熄焦低料位运行的降阻增效工艺改进

Improvement of resistance reduction and efficiency increasing process for low-level of coke operation in CDQ chamber
下载PDF
导出
摘要 介绍了某焦化厂解决热回收焦炉140 t/h干熄焦生产能力不足问题。在干熄焦生产过程中存在风量小、阻力大、排焦温度高、容易浮焦等问题。主要是从工艺角度出发,通过浮焦产生原因分析,提出低料位运行模式,从根本上解决浮焦问题。并通过1年多的运行实践,不断摸索完善低料位工艺管理制度,尽量消除不良影响因素,保证干熄焦安全高效运行。 This paper expounds the solutions to the insufficient capacity of 140 t/h CDQ for heat recovery coke oven.In CDQ operation,problems exist such as low air volume,high resistance in chamber,high temperature of coke to be discharged,and floating coke,etc..From perspective of process and through analysis of the causes of floating coke,the low-level of coke operation mode is proposed to fundamentally solve the problem of floating coke.We have been optimizing the low-level of coke management system for more than one year to minimize unfavorable factors so as to ensure safe and efficient operation of the CDQ plant.
作者 潘国建 郑成泽 Pan Guojian;Zheng Chengze(Coking Plant of Fujian Sangang Minguang Co.,Ltd.,Sanming 365000,China)
出处 《燃料与化工》 CAS 2024年第6期21-23,26,共4页 Fuel & Chemical Processes
关键词 干熄焦 能力不足 低料位 工艺管理 CDQ(Coke Dry Quenching) Insufficient capacity Low-level of coke Process management
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部