摘要 为了研究给排水长距离顶管施工技术的优势、潜在的风险以及风险管控的应对措施,结合苏州市西南片区标段为工程桩号2K+487~6K+476的污水管网的一部分,采用顶管机、推进机和排土机等大型设备,通过检测数据分析的方式,得到整个施工过程中的监测数据。分析数据得出以下结论:地表横向变形量和地表纵向变形量的变化趋势是一致的,随着管道顶进距离的增加,地表变形呈现变大的趋势;当顶管顶进距离从5 m增加到10 m时,地表变形量增加量很小,为0.5 mm;当顶管顶进距离从10 m增加到15 m时,管道与土体之间的摩擦力骤增,管道开始受到地下水压力作用,地表变形量最大,为2.3 mm;当顶管顶进距离从15 m增加到50 m时,地表变形量呈增大趋势,但是地表变形量在不断减小,为0.3 mm。 In order to study the advantages of long-distance pipe jacking construction technology for water supply and drainage,potential risks and countermeasures for risk management and control,this paper,in combination with the part of sewage pipe network with the project pile number of 2K+487~6K+476in the southwest section of Suzhou,adopts large-scale equipment such as pipe jacking machine,propelling machine and soil scraper,and obtains the monitoring data in the whole construction process by means of detection data analysis.By analyzing the data,the following conclusions are drawn:the variation trend of lateral surface deformation and longitudinal surface deformation is consistent,and with the increase of pipeline jacking distance,the surface deformation presents a larger trend;When the jacking distance of pipe jacking increases from 5mto 10m,the increase of surface deformation is very small,which is 0.5mm;When the jacking distance of pipe jacking increases from 10mto 15m,the friction between pipe and soil suddenly increases,and the pipe begins to be subjected to groundwater pressure,with the largest surface deformation of 2.3mm;When the jacking distance of pipe jacking increases from 15mto 50m,the surface deformation tends to increase,but the surface deformation is decreasing,which is 0.3mm.
作者 黄小庆 亢泽 HUANG Xiaqing;KANG Ze(Hebei Kunlun Architectural Design Co.,Ltd.,Zhangjiakou,Hebei 075000;Zhangjiakou Engineering Geotechnical Technology Co.,Ltd.,Zhangjiakou,Hebei 075000)
出处 《河北建筑工程学院学报》 CAS 2024年第3期136-140,共5页 Journal of Hebei Institute of Architecture and Civil Engineering
关键词 给排水 顶管施工 潜在风险 风险管控 Water supply and drainage Pipe jacking construction Potential risks Risk management and control