水利建设项目安全生产费用的计取在前期工作阶段、建设实施阶段有不同的要求,对应不同的计算方式。安全生产费用使用方面主要存在问题包括未在招投标文件中单列安全生产费用项目报价、工程承包合同中未约定安全生产费用有关内容、施工企业内部制度不健全且管理不规范、未按规定范围安排使用等。针对这些问题,提出了加强招投标工作中安全生产费用管理、施工企业加强内部管理等对策建议。
The calculation of safety production fees for water conservancy construction projects has different requirements and corresponding calculation methods in the preliminary stage and construction implementation stage.In terms of the management of the use of safety production fees,there are mainly problems such as not separately listing the quotation of safety production fees items in the bidding documents,not specifying the relevant content of safety production fees in the engineering contract,the internal system of contractor is imperfect,the management is not standardized,and the use is not arranged according to the specified scope.In response to these issues,suggestions were proposed to strengthen the management of safety production fees in bidding and tendering work,and to strengthen the internal management by contractor.
作者
刘洪军
LIU Hong-jun(Center of Construction Managenment&Quslity&Safety Supervision,Ministry of Water Resources,Beijing 100038,China)
出处
《海河水利》
2024年第11期44-47,共4页
Haihe Water Resources
关键词
水利建设项目
安全生产费用
提取和使用
water conservancy construction project
safety production fee
withdrawal and use