摘要
由于受到场地限制以既有建筑物布置的影响,某百万级机组燃煤电厂项目在扩建时,栈桥设计过程中进行空间布置、输煤工艺以及结构设计上的优化,采用垂直空间综合利用、高空拉紧装置、栈桥结构多样化等创新性设计方法,解决了总平面布置的难题,提高了输煤栈桥的设计水平,产生了良好的经济效果和美学效果,其可为类似工程栈桥设计提供宝贵经验。
Due to the limitations of the site and the layout of existing buildings,during the expansion of a coal-fired power plant project with a million level unit,the design of the wharf was optimized in terms of spatial layout,coal transportation technology,and structural design.Innovative design methods such as vertical space comprehensive utilization,high-altitude tensioning devices,and diversified wharf structures were adopted to solve the problem of overall layout,improve the design level of coal transportation wharf,and produce good economic and aesthetic effects.This can provide valuable experience for similar engineering wharf design.
作者
王真
孙勇
刘毅
谭学谦
WANG Zhen;SUN Yong;LIU Yi;TAN Xue-qian(China Energy Engineering Group Guangdong Electric Power Design Institute Co.,Ltd.,510670,Guangzhou,China;CHN ENERGY Yuedian Taishan power generation Co.,Ltd.,529200,Taishan,Guangzhou,China)
出处
《建筑技术》
2024年第S01期192-194,共3页
Architecture Technology
关键词
输煤栈桥
空间综合利用
高空拉紧装置
结构设计
coal conveying trestle
comprehensive utilization of space
high altitude tensioning device
structure design