地下连续墙是一种强大的地下围护结构,广泛应用于各类建筑基础工程中。用于城市地铁车站围护结构的地下连续墙施工过程中,钢筋笼的整体吊装是一项至关重要的环节,其质量控制直接关系到地下连续墙的稳定性和安全性。本文以佛山地铁11号线某车站深基坑地下连续墙施工为例,简要探讨地下连续墙钢筋笼整体吊装的质量控制要点,对后续类似工程施工具有一定参考意义。
Underground diaphragm wall is a kind of powerful underground enclosure structure,which is widely used in all kinds of building foundation engineering.In the construction process of underground diaphragm wall used in urban subway station envelope,the overall lifting of steel cage is a crucial link,and its quality control is directly related to the stability and safety of underground diaphragm wall.Taking the construction of underground diaphragm wall of deep foundation pit in a station of Foshan Metro Line 11 as an example,this paper briefly discusses the key points of quality control of the integral lifting of steel cage of underground diaphragm wall,which has certain reference significance for the subsequent construction of similar projects.
作者
李恒
LI Heng(The First Engineering Branch of China Railway Construction Port and Shipping Bureau Group Co.,Ltd.,Guangzhou 511442,China)
出处
《价值工程》
2024年第33期4-6,共3页
Value Engineering
关键词
地下连续墙
钢筋笼
整体吊装
diaphragm wall
reinforcement cage
integral lifting