施工项目全周期造价控制研究

Research on Full Cycle Cost Control of Construction Projects
下载PDF
导出
摘要 本研究聚焦施工项目全周期造价控制的优化策略,以确保项目在成本、效益和风险管理上达到最佳平衡,分析现有造价控制实践及其面临的如成本预测不准、风险管理不足、信息不对称等主要挑战,提出一系列创新策略。重点构建利用云计算和大数据等现代信息技术实现项目各方信息实时更新与共享的高效信息共享平台,强调建立系统的风险评估与控制机制以及应用基于BIM技术和机器学习算法等的先进造价预测模型以提高预测准确性和项目管理透明度,旨在经过这些策略实现造价管理科学化、精确化,优化资源配置,增强项目的经济和社会价值。 This study focuses on the optimization strategies for the full cycle cost control of construction projects,in order to ensure the optimal balance between cost,benefit,and risk management.It analyzes the existing cost control practices and the main challenges,such as inaccurate cost forecasting,insufficient risk management,and information asymmetry,and proposes a series of innovative strategies.It focus on building an efficient information sharing platform that utilizes modern information technologies such as cloud computing and big data to achieve real-time updates and sharing of information among all parties involved in the project.Emphasis is placed on establishing a systematic risk assessment and control mechanism,as well as applying advanced cost prediction models based on BIM technology and machine learning algorithms to improve prediction accuracy and project management transparency.The aim is to achieve scientific and precise cost management,optimize resource allocation,and enhance the economic and social value of the project through these strategies.
作者 周勇 ZHOU Yong(Shenzhen Quanzhi Engineering Consulting Co.,Ltd.,Shenzhen 518063,China)
出处 《价值工程》 2024年第33期50-52,共3页 Value Engineering
关键词 全周期造价控制 信息共享 风险管理 成本预测 BIM技术 full cycle cost control information sharing risk management cost forecast BIM technology
  • 相关文献

参考文献4

二级参考文献21

共引文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部