电力建设工程项目进度计划管理措施分析

Analysis on Management Measure of Power Construction Engineering Project Schedule
下载PDF
导出
摘要 电力建设工程中的环节相对较多,资源协调难度较大,需要对其进行进度计划管理,保证电力建设工程按计划完成。文章总结项目进度控制要点,并提出制订详细的进度计划方案、加强工程准备工作、对施工过程进行进度管理、协调工程各项目的分工合作及实时监督等进度计划管理措施,旨在保证电力建设工程按时交付。 There are relatively many links in the power construction engineering,and it is difficult to coordinate resources.It is necessary to carry out schedule management to ensure that the power construction engineering is completed as planned.This paper summarizes the key points of project schedule control,and puts forward some schedule management measures,such as formulating detailed schedule plan,strengthening engineering preparation,conducting schedule management of construction process,coordinating division and cooperation of various projects and carrying out real-time supervision,in order to ensure the timely delivery of power construction engineering.
作者 崔淑睿 CUI Shurui(China Energy Engineering Group Jiangsu No.3 Electric Power Construction Co.,Ltd.,Zhenjiang 212003,Jiangsu,China)
出处 《工程技术研究》 2024年第17期137-139,共3页 Engineering and Technological Research
关键词 电力建设工程 进度计划 协调管理 power construction engineering schedule coordination management
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部