矮塔斜拉桥施工监控技术研究

Research on Construction Monitoring Technology for Low Tower Cable-stayed Bridges
下载PDF
导出
摘要 文章以广州某矮塔斜拉桥为工程背景进行矮塔斜拉桥施工监控技术研究,系统介绍了矮塔斜拉桥的施工监控目的、方法、内容和具体实施过程。采用空间梁单元模型进行施工全过程仿真计算分析,对施工过程中结构安全进行评估。通过自适应控制法施工监控控制技术,最终得到的成桥状态与设计成桥状态吻合良好,各项指标均满足设计与相关规范的要求。所采用的技术方法可供同类型桥梁借鉴与参考。 This article focuses on a low-pylon cable-stayed bridge in Guangzhou as the engineering background to research the construction monitoring technology of low-pylon cable-stayed bridges.It systematically introduces the construction monitoring purposes,methods,content,and specific implementation process of low-pylon cable-stayed bridges.By utilizing a spatial beam element model for simulation calculation and analysis of the entire construction process,it evaluates the structural safety during the construction process.Through the adaptive control method construction monitoring and control technology,the final bridge state obtained is in good agreement with the designed bridge state,and all indicators meet the requirements of the design and relevant specifications.The adopted technical methods can be used as a reference for similar bridges.
作者 官显金 庞铁军 周世雄 GUAN Xianjin;PANG Tiejun;ZHOU Shixiong(Guangdong Traffic Engineering Quality Testing Center of Building Academy Co.,Ltd.Guangzhou 510530,China;Guangdong Province Traffic Infrastructure Intelligent Detection Engineering Technology Research Center Guangzhou 510530,China)
出处 《广东土木与建筑》 2024年第11期85-88,共4页 Guangdong Architecture Civil Engineering
关键词 矮塔斜拉桥 施工监控 自适应控制法 仿真计算分析 监测数据分析 low tower cable-stayed bridge construction monitoring adaptive control method simulation calculation analysis monitoring data analysis
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部