义乌市某工业水厂出水水质较差,用水端反渗透膜堵塞频繁。基于此,提出了近期结合远期的改造运行方案,以延长膜堵塞周期。通过分析膜堵塞物的元素成分,发现有机物的主要元素C、O、N、P的占比分别为35.62%、32.64%、27.08%、0.76%,四种元素总占比高达96.10%,因此有机物是膜堵塞的主要原因。近期方案使用活性炭结合曝气生物滤池的联合工艺,总有机碳(TOC)去除率可达33.85%。远期方案增加预臭氧-活性炭-后臭氧(沉后)-活性炭工艺,TOC去除率可进一步提高至50%左右。该方案综合了近期与远期的运行策略,既满足了应急处理的需求,又达到了长期稳定运行的目标,可为实际工程中其他工业水厂出现类似现象提供技术经验。
The effluent quality of an industrial water plant in Yiwu City is substandard,and the reverse osmosis membrane at the water end is clogged frequently.On this basis,the paper proposed a short-term combined with long-term operation plan to prolong the membrane fouling period.By analyzing the elemental composition of the membrane-fouling material,it was discovered that the main elements of organic matter,namely C,O,N,and P,accounted for 35.62%,32.64%,27.08%,and 0.76%respectively and the total proportion of these four elements was as high as 96.10%. Therefore, organic matter was theprimary cause of membrane fouling. In the short-term operation plan, the combined process of activatedcarbon and biological aerated filter was employed, and the removal efficiency of TOC reached 33.85%. Inthe long-term operation plan, the process of pre-ozonation-activated carbon-post-ozonation (postprecipitation)-activated carbon was incorporated, and the TOC removal efficiency could be furtherelevated to approximately 50%. This plan integrated the short-term and long-term operational strategies,not only fulfilling the requirements of emergency treatment but also attaining the objective of long-termstable operation, which could offer technical experience for other industrial water plants with similarphenomena in actual projects.
作者
郑效旭
邵志平
邢朝阳
朱红斌
童晓静
杨阳
黄振华
张旭坡
吴俊辉
张亮
王靖霖
王东升
徐圣君
ZHENG Xiao-xu;SHAO Zhi-ping;XING Zhao-yang;ZHU Hong-bin;TONG Xiao-jing;YANG Yang;HUANG Zhen-hua;ZHANG Xu-po;WU Jun-hui;ZHANG Liang;WANG Jing-lin;WANG Dong-sheng;XU Sheng-jun(Research Center for Eco-Environmental Sciences,Chinese Academy of Sciences,Beijing 100085,China;Yangtze River Delta Research Center for Eco-Environmental Sciences<Yiwu>,Yiwu 322000,China;Zhejiang Yiwu Municipal Water Affairs Bureau,Yiwu 322000,China;Jinhua Ecological Emergency Response and Monitoring Center,Jinhua 321000,China)
出处
《中国给水排水》
CAS
CSCD
北大核心
2024年第21期67-72,共6页
China Water & Wastewater
基金
国家自然科学基金资助重点项目(52030003)。
关键词
工业水厂
膜堵塞
粉末活性炭
预臭氧
后臭氧
industrial water plant
membrane fouling
powdered activated carbon
preozonation