摘要
介绍悬臂翻升模板在韩江高陂水利枢纽大模板混凝土浇筑施工中的应用。对翻转模板的受力进行了验算,包括荷载计算和拉杆计算,确保模板的稳定性和安全性,介绍了悬臂翻升模板体系在水坝施工中的具体应用过程。包括模板的安装、混凝土浇筑和模板的拆除。通过悬臂翻升模板的使用,实现了高效、安全、节约的施工方式,提高了施工效率和质量。
This paper introduces the application of cantilever lifting formwork in the large formwork concrete pouring construction of Hanjiang Gaobei Water Conservancy Hub.It verifies the stress of the flipping formwork,including load calculation and tension rod calculation,to ensure the stability and safety of the formwork.It introduces the specific application process of the cantilever flipping formwork system in dam construction,including formwork installation,concrete pouring,and formwork removal.By using cantilever lifting templates,an efficient,safe,and cost-effective construction method has been achieved,improving construction efficiency and quality.
作者
林育佳
LIN Yujia(Guangdong NO.2 Hydropower Engineering Company,Ltd.,Guangzhou 510000,China)
出处
《云南水力发电》
2024年第11期85-88,共4页
Yunnan Water Power
关键词
悬臂翻升模板
韩江高陂水利枢纽
大模板混凝土浇筑
模板施工
cantilever lifting template
Hanjiang Gaobei Water Conservancy Hub
large formwork concrete pouring
template construction