摘要
本文分别从施工工艺原理、施工质量要求等方面分析加强带在大型混凝土池体构筑物实施的可行性,同时通过分析某污水处理厂三期工程中AAO生化池加强带应用案例,对其施工技术措施、质量控制措施进行说明,对加强带及后浇带施工工艺进行比对分析,最后总结项目实施取得的成效,技术应用实践经验可以为今后类似工程中的大型混凝土构筑物工程实施提供参考。
This paper analyzes the feasibility of implementing the reinforcing strip in large concrete pool structure in terms of construction technology principle and construction quality requirements,and analyzes the application case of AAO biochemical tank reinforcing belt in the Phase III project of a sewage treatment plant,explains its construction technical measures and quality control measures,compares and analyzes the construction technology of reinforcing strip and post-cast strip,and finally summarizes the results of project implementation.The practical experience of technology application can provide a reference for the implementation of large concrete structure in similar projects in the future.
作者
赵汝霖
Zhao Ru-lin(Shanghai Municipal Engineering Design Institute(Group)Co.,Ltd.,Shanghai 200092,China)
出处
《建筑与装饰》
2024年第22期175-177,共3页
Construction & Decoration
关键词
加强带
微膨胀混凝土
大型混凝土池体
reinforcing strip
micro-expansive cement concrete
large concrete pools