摘要
以元氏县盛元路下穿京广铁路框架桥为例,对下穿铁路框架桥的顶进施工技术及应用进行分析。介绍了顶推法框架桥的施工准备,阐述了顶推过程中的技术要点、测量控制和安全控制措施。案例实测数据和理论值分析结果表明,顶推法施工有效减少了对铁路运输的影响。
Taking Shengyuan road in Yuanshi County as an example,this paper analyzes the jacking construction technology and application of the underpass railway frame bridge.Introduces the construction preparation of jacking method frame bridge,describes the technical points,measurement control and safety control measures in the jacking process.The results of the analysis of the measured data and theoretical values of the case show that the impact on railway transportation is effectively reduced by the jacking method.
作者
王金龙
王子轩
朱光昊
WANG Jinlong;WANG Zixuan;ZHU Guanghao(College of Transport and Civil Engineering,Shandong Jiaotong University,Shandong Jinan 250357 China;Carnegie Mellon University,5000 Forbes Ave,Pittsburgh,PA 15213)
关键词
下穿铁路
框架桥
斜交
顶推法施工
技术分析
underpass railway
frame bridge
oblique
pushing method construction
technical analysis