电力工程现场签证与工程变更的管理措施研究

Research on Management Measures for On-Site Visas and Engineering Changes in Power Engineering
下载PDF
导出
摘要 电力工程建设中,现场签证与工程变更是常见但易引发纠纷的问题。签证管理不规范、变更控制不到位会影响工程质量、进度与投资。文章分析电力工程现场签证与工程变更管理的主要问题,针对性地提出优化签证申请与审核流程、加强签证定价与计量管理、完善签证文档管理、强化签证风险管控等措施,并从变更申请与审批、实施与控制、成本与信息管理等方面,探讨强化电力工程变更管理的具体路径,为规范电力工程现场管理、控制工程造价、提高投资效益提供参考。 In power engineering construction,on-site visa and engineering changes are common issues that can easily lead to disputes.Non-standardized visa management and inadequate change control can affect project quality,progress,and investment.This paper analyzes the main problems in the management of on-site visas and engineering changes in power engineering projects and proposes targeted measures to optimize the visa application and review process,strengthen pricing and measurement management for visas,improve document management for visas,and enhance risk management for visas.Additionally,it discusses specific paths to strengthen change management in power engineering from aspects such as change application and approval,implementation and control,cost management,and information management,providing a reference for standardizing on-site management,controlling engineering costs,and improving investment benefits.
作者 于波 张强 余涛 常盛楠 李月华 Yu Bo;Zhang Qiang;Yu Tao;Chang Shengnan;Li Yuehua(State Grid Ningxia Electric Power Co.,Ltd.,Yinchuan 750001,China;Yinchuan Power Supply Co.,State Grid Ningxia Electric Power Co.,Ltd.,Yinchuan 750011,China)
出处 《办公自动化》 2024年第24期78-80,共3页 Office Informatization
基金 输变电工程大数据信息系统,项目编号:7129NX22000H,项目来源:国网宁夏电力有限公司信息化项目。
关键词 电力工程 现场签证 工程变更 管理措施 electric power engineering on-site visa engineering change management measure