期刊文献+

如何提高外立面巨型鎏金壁画合格率控制措施

How to Improve Pass Rate Control Measures for Giant Gilt Murals on Facade
下载PDF
导出
摘要 本研究以中国大酒店外立面综合维修保养工程为背景,结合外墙巨型鎏金壁画待修复程度,以提升修复大型鎏金壁画合格率到90%以上为研究目的,挖掘影响合格率的各方面因素,并在此基础上提出了控制措施,阐述实施原因以及实施效果检查过程。研究结果表明,采用双层粘贴工艺进行贴金修复处理,不仅有效地提升了大型鎏金壁画修复施工合格率,同时也提升了团队成员的质量意识、改进意识、分析问题与解决问题能力以及实践能力。 Based on the comprehensive maintenance project on the facade of China Hotel,combined with the degree of giant gilt murals to be restored on the exterior wall,this study aims to improve the pass rate of the restored giant gilt murals to higher than 90%,identify various factors affecting the pass rate,and accordingly propose control measures,and explain the reasons for the implementation and the inspection process of the implementation effect.The study results show that,the double-layer pasting process for gilding restoration not only effectively improves the pass rate of giant gilt mural restoration,but also improves the quality awareness,improvement awareness,problem analysis and problem solving ability and practical ability of team members.
作者 林凤枝 Lin Feng-zhi(Guangzhou No.3 Building Decoration Co.,Ltd.,Guangzhou 510000,Guangdong Province,China)
出处 《建筑与装饰》 2024年第23期157-159,共3页 Construction & Decoration
关键词 外立面 巨型鎏金壁画 合格率 控制措施 facade giant gilt mural pass rate control measure
  • 相关文献

参考文献3

二级参考文献26

共引文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部