期刊文献+

近距离煤层过上覆煤柱回采全生命周期防治措施及应用

Full life cycle prevention and control measures and their application of close distance coal seams passing through overlying coal pillar
下载PDF
导出
摘要 针对石圪台矿22^(上)1041综采工作面过上覆12102辅运巷道煤柱时出现的顶板控制难题,结合上覆煤柱对下工作面动压灾害机理的详细分析,提出了“采前弱化治理+采中全过程控制”的全生命周期治理措施,并应用于生产中。根据现场采集的矿压数据可知,采用该治理措施可有效控制避免强矿压显现出现和缩短来压步距,进而避免工作面出现顶板安全事故与相关次生灾害。 Aiming at the difficult problem of roof control when the 22-upper-1041 fully mechanized mining face passes through the overlying 12102 auxiliary transportation roadway pillar in Shigetai Coal Mine,the mechanism of the dynamic pressure disaster of the lower working face by the upper coal pillar was analyzed in detail,the full life cycle control measures of"roof weakening before mining and whole-process control during mining"were proposed and applied in production.According to the rock pressure data collected on the site,the control measures could effectively control and avoid the occurrence of strong mine pressure and shorten the roof weighting step,thus avoiding roof safety accidents and related secondary disasters in the working face.
作者 何沛东 孙远航 HE Peidong;SUN Yuanhang(Shigetai Coal Mine,China Energy Shendong Coal Group Co.,Ltd.,Yulin,Shaanxi 719315,China)
出处 《中国煤炭》 北大核心 2024年第S01期161-165,共5页 China Coal
关键词 近距离煤层 全生命周期 覆岩运动 动载矿压 close distance coal seams full life cycle overburden movement dynamic mine pressure
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部