期刊文献+

预制箱梁安装施工技术在市政桥梁工程中的应用研究

Application of Prefabricated Box Beam Installation Construction Technology in Municipal Bridge Engineering
下载PDF
导出
摘要 箱梁的安装作为桥梁施工中较为关键的施工工序,也是桥梁安全施工中的一项重要工作,施工方须结合项目的实际特点和规范要求,制定详细的施工方案,确保桥梁施工的安全性。分析了桥梁预制箱梁施工的特点,总结了预制箱梁安装施工流程,阐述了桥梁预制箱梁安装施工技术要领。结合工程实例,深入探讨了预制箱梁安装施工技术实际操作要点,旨在规范预制箱梁安装施工作业流程,科学开展现场施工作业,保障桥梁预制箱梁施工顺利完成。 The installation of box girders is a critical construction process in bridge construction and an important task in bridge safety construction.The construction party needs to develop a detailed construction plan based on the actual characteristics and regulatory requirements of the project to ensure the safety of bridge construction.This article analyzes the construction characteristics of prefabricated box girders for bridges,summarizes the installation and construction process of prefabricated box girders,elaborates on the technical points of prefabricated box girder installation and construction for bridges,and combines engineering examples to deeply explore the practical operation points of prefabricated box girder installation and construction technology.The aim is to standardize the installation and construction process of prefabricated box girders,scientifically carry out on-site construction operations,and ensure the smooth completion of prefabricated box girder construction for bridges.
作者 李杰涛 Li Jietao(Shenzhen Road&Bridge Group Co.,Ltd.,Shenzhen,Guangdong 518000)
出处 《现代工程科技》 2024年第22期99-102,共4页 Modern Engineering Technology
关键词 市政桥梁工程 预制箱梁安装 施工技术 municipal bridge engineering installation of prefabricated box girders construction technique
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部