摘要 文中结合实际工程,提出库区急流裸岩环境下钢栈桥施工技术,对该工法进行分析计算,验证了该工法在库区急流裸岩下的适用性,同时对钢栈桥水流速进行参数分析,流速每增加1 m/s,钢管桩最大应力只增加0.1 MPa。结果表明,该施工方法能够满足施工要求,同时,急流环境下的水流速不是钢栈桥应力验算的主要因素,急流环境主要影响钢管桩的定位精度。 In the article,based on practical engineering,the construction technology of steel wharf under the environment of rapid flow and bare rock in the reservoir area is proposed.The method is analyzed and calculated to verify its applicability under the conditions of rapid flow and bare rock in the reservoir area.At the same time,parameter analysis is conducted on the water flow velocity of the steel wharf.For every 1 m/s increase in flow velocity,the maximum stress of the steel pipe pile only increases by O.1 MPa.The results show that the construction method can meet the construction requirements,and the water flow rate in the rapid flow environment is not the main factor for stress calculation of the steel trestle.The rapid flow environment mainly affects the positioning accuracy of the steel trestle.
作者 高文银 陈文尹 郑向东 李嘉鑫 Gao Wenyin;Chen Wenyin;Zheng Xiangdong;Li Jiaxin(Sichuan Kangzang Road and Bridge Co.Ltd.,Ya'an,Sichuan 625000;China Railway Fourth Bureau Group Seventh Engineering Branch,Hefei,Anhui 230000;Ya'an Transportation Construction(Group)Co.Ltd.,Ya'an,Sichuan 625000;School of Civil Engineering,Southwest Jiaotong University,Chengdu,Sichuan 610031)
出处 《江西建材》 2024年第7期254-256,262,共4页
关键词 钢栈桥 急流裸岩 施工技术 Steel trestle Rapids bare rock Construction technology
  • 相关文献

参考文献6

二级参考文献21

共引文献116

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部