摘要
综合近 3 0年来国内工程冻土学界对多年冻土地区 ,尤其是青藏高原多年冻土区桥梁桩基研究的成果 ,评述冻土区桥梁灌注桩工作原理及承载力计算方法。结合现场桩基回冻过程地温场变化测试数据 ,对桩基承载力的影响因素、施工工艺提出建议。
An assessment was made of working principle and bearing capacity computation of cast\|in\|site bored pile in permafrost zone based on summary of research achievements in recent 30 years on pile foundation at permafrost zone, especially Qinghai\|Tibet Plateau by permafrost engineering circle of China. Some advice is raised about factors affecting the bearing capacity of pile foundation and construction technology based on site testing data.
出处
《铁道标准设计》
2002年第12期28-30,共3页
Railway Standard Design
关键词
桥梁
青藏铁路
多年冻土
厚层地下水
钻孔灌注桩
承载力
桩基试验
Qinghai\|Tibet Railway, permafrost soil, deep iced ground, cast\|in\|site bored pile, bearing capacity