摘要
以光缆敷设为例 ,分析阻工现象对工程进度的影响 ,建立有约束条件的最短工期优化模式 ,搜索最优目标。
Taking optical fiber cable laying as an example, the effect of work hindrance phenomenon on job progress is analyzed and an optimization model of constrained shortest project period is constructed to search for optimal target.