摘要
本文利用模糊综合评判法对施工进度计划管理进行了研究 ,结果表明 ,该方法可以提高施工进度计划管理的科学性和实用性。
This paper studied the administration of engineering progress project,by means of the application of the method of fuzzy comprehensive judgement. The study results showed that the scientificity and practicability of administration of construction schedule plan had been increased by the method.
出处
《山西农业大学学报(自然科学版)》
CAS
2002年第3期264-268,共5页
Journal of Shanxi Agricultural University(Natural Science Edition)
关键词
模糊综合评判法
建筑施工
进度计划
应用
Fuzzy comprehensive judgement
Construction schedule plan
Administration