从发电公司参与期货市场的角度出发 ,以动态规划法为分析基础 ,对发电公司中机组约束和机组运行成本之间的关系进行分析。
On the basis of the dynamic programming, the relations between the unit constraint and its cost are analyzed when the generation company participates in the futures trade of power pool. Results show that the cost of the generation company can be reduced by modifying the unit constraint.