期刊文献+

南水北调中线工程丹江口水库泥沙冲淤计算 被引量:3

Sediment accumulation calculation on Danjiangkou Reservoirfor Water Transfer Project from South to North
下载PDF
导出
摘要 利用一维不平衡输沙原理对丹江口水库大坝加高后,水库正常蓄水位抬高至170m运行时的库区泥沙冲淤进行了计算分析。计算成果表明:当枢纽运行至100a末时,汉江干流库区淤积量为36.34亿t,当枢纽运用至20a末,遇不同频率洪水时,受库区泥沙淤积的影响,在距坝190km以下的河段水位有所抬高,距坝190km以上的河段水位不受泥沙淤积的影响。 The sediment accumulation calculation on Danjiangkou Reservoir after the dam being heightened was performed by one dimensional unequilibrium sediment transmission principle under the condition of the reservoir water level being raised to 170 m. The calculation results indicate that:when the reservoir will be operated 100 years,the sediment accummulation amount will be 36.34×108 t;when the project will be operated by the end of 20 years with different frequencies of flood,the water level within reach 190 km apart from the dam will be raised to some extent due to the influence of reservoir sedimentation, but that upstream this reach will be not affected.
出处 《长江科学院院报》 CSCD 北大核心 2002年第B09期40-43,共4页 Journal of Changjiang River Scientific Research Institute
关键词 南水北调中线工程 丹江口 水库泥沙 冲淤 数学模型 洪水位 dam heightening sediment in reservoir area mathematical model flood level
  • 相关文献

参考文献2

  • 1张瑞瑾 谢鉴衡.河流泥沙动力学[M].水利电力出版社,1988..
  • 2韩基伙 黄煜龄.水库冲淤过程计算方法及电子计算机的应用.水利水电工程应用电子计算机资料选编[M].北京:中国水利电力出版社,1977..

共引文献11

同被引文献14

引证文献3

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部