期刊文献+

穿黄工程河段冲刷问题研究综述 被引量:1

Summarization of researches on erosion problemin reach for Yellow-River-crossing works of Middle Lineof Water Transfer Project from South to North China
下载PDF
导出
摘要 通过对比分析穿黄河段历史冲淤演变、小浪底运用后的冲刷分析、不同比尺及工况泥沙模型试验和二维数学模型计算,有关公式的计算成果,对孤柏嘴隧洞断面河段的冲刷深度进行了综合分析,提出了相应的冲刷深度、一般冲刷的最大水深及最低深泓点高程。 By means of comparison and analysis on historicel data of evolution of sediment erosion?deposition in the reach for Yellow?River?crossing works, analysis of erosion after the Xiaolangdi Project being used,sodiment model test results with different scales and under different conditions, 2?D mathematic model and calculation by empirical formulae,the erosion depth at the eross?section of Gubozui is sythetically analyzed. Then the relevant erosion depth, the maximum water depth after erosion and the altitude of the lowest riverbed are also propsoed.
出处 《长江科学院院报》 CSCD 北大核心 2002年第B09期47-50,共4页 Journal of Changjiang River Scientific Research Institute
关键词 穿黄工程 南水北调 穿黄河段 孤柏嘴断面 冲刷深度 Water Transfer Project from South to North China Yellow-River-crosing works’stretch cross-section of Gubozui erosion depth
  • 相关文献

参考文献6

  • 1师哲 郭炜.南水北调中线穿黄工程方案泥沙模型试验报告[M].武汉:长江科学院,2002..
  • 2张红武.南水北调中线工程穿黄河段河床演变规律及对行洪影响的研究[M].北京:清华大学,2002..
  • 3张红武 李保如.南水北调中线穿黄河段物理模型初步试验报告[M].郑州:黄河水利委员会水利科学研究院,1995..
  • 4石春先 李世滢 等.小浪底水库2000年运用研究报告[M].郑州:黄河水利委员会设计院,2000..
  • 5黄建成 马秀琴 等.南水北调中线穿黄工程河道缩窄动床模型试验研究阶段报告[M].武汉:长江科学院,1999..
  • 6余明辉.南水北调中线穿黄工程河段平面二维水沙计算分析报告[M].武汉:武汉大学水电学院,2002..

共引文献1

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部