南水北调中线工程总干渠岩石力学与工程问题 被引量:2

Rock mechanics and engineering problems on general main channel ofMiddle Line of Water Transfer Project from South to North China
下载PDF
导出
摘要 根据南水北调中线工程总干渠通过软岩区和采煤区的工程地质条件,提出了软岩特别是膨胀软岩的渠坡稳定性及支护措施、软岩地基承载力以及采煤区地表变形塌陷对渠道的影响等主要岩石力学与工程问题,以及为解决这些岩石力学问题所需要采取的研究途径和研究方法。 Based on the engineering geological conditions of the general main channel of Middle Line of Water Trasfer Project from South to North China, some rock mechanics and engineering problems on stability and reinforcement measures of channel slopes in the soft rock areas, specially in the expanded soft rock areas, on foundation bearing capacity of soft rock and the influence of deformation and collapse of ground surface in the coal?mining zones on channels are pointed out and discussed. The research approaches and methods needed to be adopted for solving these problems are proposed.
出处 《长江科学院院报》 CSCD 北大核心 2002年第B09期114-116,共3页 Journal of Changjiang River Scientific Research Institute
关键词 总干渠 南水北调 岩石力学 稳定性 支护 Water Transfer Project from South to North China rock mechanics engineering problem research way
  • 相关文献

参考文献1

  • 1长江水利委员会.南水北调中线工程可行性研究报告[M].武汉:长江水利委员会,1992..

同被引文献51

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部