期刊文献+

引黄联接段公路2号隧道错车道塌方原因分析及处理方法

Analysis and Contermeasures of Landslip of Branch Heading Happened in No.2 Tunnel on the Road of Connection Works,YRDP
下载PDF
导出
摘要 从工程地质条件、施工方法及施工环境等方面对引黄联接段公路 2号隧道错车道塌方原因进行了综合分析 ,介绍了该隧道塌方处理方法及后续施工采用的工程措施 ,并提出了对防止类似工程地质条件下隧道塌方的认识 。 This paper makes a comprehensive analysis concerning the reason for landslip of branch heading happened in No.2 tunnel on the road of Connection Works,YRDP,from the aspects of engineering geolgical conditions,construtions methods,construction environment and etc;introduces the treatment methods of the landslip and the engineering measures adopted in the succeeding construction;and ,provides some suggestions on how to prevent the tunnel from landslip under similar geolgical conditions,which provide reference to the staff who is working for tunnel design and construction
出处 《山西电力》 2002年第A02期34-36,共3页 Shanxi Electric Power
关键词 引黄联接段 公路2号隧道 错车道 塌方 分析 处理方法 tunnel landslip treatment
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部