期刊文献+

引黄工程总干三级泵站侧向进水前池水工模型试验研究

Test and Reseach on Hydraulic Engineering Modal of Main Stream Three Grade Pump Station Lateral water Inlet Front Pond,YRDP
下载PDF
导出
摘要 介绍了通过水工模型试验提出的引黄入晋工程总干三级泵站侧向进水前池的优化体型及为调整水流结构而采取的整流板等工程措施 ,这些措施使泵站进水前池中水流流态平稳 ,流速分布均匀 ,避免了在各种工况下前池中产生螺旋流及水面串通漏斗漩涡 ,能保证水泵安全、正常。 It introduces optimal modal type of main stream three grade pump station lateral water inlet front pond,YDRP through hydraulic engineering modal test,and engneering measure of adopting rectificating plate for adjusting water flow structure.These measures made water flows stable,flow speed distribution even,avoiding spiral flow and whirlpool on all kinds of,normally,and with high efficency.
出处 《山西电力》 2002年第A02期37-41,共5页 Shanxi Electric Power
关键词 引黄工程 三级泵站 侧向进水前池 水工模型试验 螺旋流 整流板 泥沙淤积 three stage pump station lateral water inlet front pond hydraulic engneering model test spiral flow rectifiating plate mud and sand deposit
  • 相关文献

参考文献1

  • 1钱宁 万兆惠.泥沙运动力学[M].北京:科学出版社,1986.309.

共引文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部