摘要
对引黄联接段技施阶段重新测量工程进行简介 ,针对古交市区内改线、 2号洞进口、 5号洞出口、河扫公路等线路的调整而引起技施阶段的重新测量工作过程中作了技术分析 ,对实际问题进行总结并提出合理化建议。
It gives a brief introduction on remeasure project of technicial design in connection works,the YRDP.The technicial analysis in remeasure work progress of technicial design was carried through,that is to adjust circuitry about inlet of No.2 Tunnel,outlet of No.5 Tunnel,HESAO Road and intenal realignment of Gujiao city.At the same time,it puts up summarize practial problems and puts forward reasonable proposal.
出处
《山西电力》
2002年第A02期42-43,共2页
Shanxi Electric Power