详细分析了石白线剖口入清江变后 ,江西电网南部外送、西部外送和丰城电厂外送稳定水平的变化。
This text analyses amply how the Stability level for transporting electric power of the Southwest of Jiangxi power system and Fengcheng power plant will be changed when the Qingjiang substation cuts into shibai AC line.
出处
《江西电力职工大学学报》
2002年第4期16-18,共3页
Journal of Jiangxi Electrical University For Staff