摘要
本文扼要阐述了古田溪一级电站1~#、2~#机更新增容过程及其经济效益,并提出了几点值得探讨的意见。
The process of uprating improvement and its economical effect of 1~# and 2~# turbine/generator units for Gutianxi l■st step power station are Introduced.Some points of view,which,will be valuable to discus,are presented.
出处
《大电机技术》
北大核心
1992年第6期49-52,58,共5页
Large Electric Machine and Hydraulic Turbine
关键词
增容改造
水电站
水轮发电机
turbine/generator units
uprating mprovement