摘要
核电工程项目规模大、工艺复杂、建设周期长,对核电工程进度如何实施有效的控制,是项目管理的中心任务。论文重点针对核电安装工程进度计划管理体系与不同计划的编制方法进行论述,并针对进度计划执行过程中的进度统计、偏差分析与纠偏措施进行了探讨。
The nuclear power engineering projects are of large scale, complex technology,and long construction period.How to effectively control the schedule of nuclear power engineering projects, is the central task of project management. The management system and different preparation methods in nuclear power installation project schedule are mainly discussed here, and progress statistics, error analysis and corrective measures in the schedule execution process are explored.
出处
《工程建设与设计》
2016年第8X期221-222,共2页
Construction & Design for Engineering
关键词
核电
安装工程
进度计划
进度控制
nuclear power
installation project
schedule
schedule control