地下结构采用逆作法施工时,与常规的施工方法不同的是先施工水平结构,再施工竖向结构,水平与竖向结构节点施工质量对整个逆作法施工起到关键的作用。针对太原红星美凯龙项目地下结构采用局部逆作法施工,总结了逆作法结构相关节点施工工艺。可为北方地区类似工程提供参考。
There is a difference between top-down construction and traditional construction on underground structures, in construction sequence the vertical structure construction is after horizontal. The horizontal and vertical structure nodes play key role in top-down construction. This paper summarizes the construction technology of structure nodes in top-down construction according the top-down construction apply on underground structure of Macalline engineering in Taiyuan city. It can provide a reference to related engineering in north area.
出处
《工程建设与设计》
2016年第11X期38-39,41,共3页
Construction & Design for Engineering
关键词
逆作施工
节点设计
环梁节点
top-down construction
node design
ring beam node