地下结构逆作施工时水平与竖向结构节点处理方法

Handling Methods of Horizontal and Vertical Structure Nodes in Underground Structure Top-Down Construction
下载PDF
导出
摘要 地下结构采用逆作法施工时,与常规的施工方法不同的是先施工水平结构,再施工竖向结构,水平与竖向结构节点施工质量对整个逆作法施工起到关键的作用。针对太原红星美凯龙项目地下结构采用局部逆作法施工,总结了逆作法结构相关节点施工工艺。可为北方地区类似工程提供参考。 There is a difference between top-down construction and traditional construction on underground structures, in construction sequence the vertical structure construction is after horizontal. The horizontal and vertical structure nodes play key role in top-down construction. This paper summarizes the construction technology of structure nodes in top-down construction according the top-down construction apply on underground structure of Macalline engineering in Taiyuan city. It can provide a reference to related engineering in north area.
作者 刘继来
出处 《工程建设与设计》 2016年第11X期38-39,41,共3页 Construction & Design for Engineering
关键词 逆作施工 节点设计 环梁节点 top-down construction node design ring beam node
  • 相关文献

参考文献1

二级参考文献6

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部