摘要
核电厂的调试是一个连接建筑安装和生产的过渡阶段,一方面检验电站建设质量,另一方面奠定稳定运行基础。调试工作的质量管理更是整个核电站寿期内质量管理工作的重中之重。
Nuclear power plant debugging is transition stage between construction safety and production. On the one hand, it can detection the construction quality of power plant, on the other hand it can establish a stable operation basis. Debugging work of quality management is the priority of quality management in the period of plant life.
出处
《工程建设与设计》
2016年第11X期64-65,76,共3页
Construction & Design for Engineering
关键词
核电厂
调试质量管理
核安全
nuclear power plant
debugging quality management
nuclear security