摘要
阐述了燃煤电站电气安装以及针对热控仪表施工工艺的探讨,希望为类似工程提供一些参考。
This paper expounds the electric installation of coal-fired power station and discusses the construction technology of thermal control instrument, hoping to provide some references for similar engineering.
出处
《工程建设与设计》
2018年第S1期57-59,共3页
Construction & Design for Engineering
关键词
电气安装施工
热控仪表
汽轮机监控(TSI)
electrical installation construction
thermal control instrument
turbine monitoring(TSI)