摘要
内蒙古哈伦能源2×330MW热电联产项目A标段是迪尔集团有限公司承接的第一台主标段建筑安装工程,是该公司目前承接的机组规模最大的综合性工程。做好现场施工管理组织,对工程的顺利完成有着重要的作用。论文主要对现场施工中遇到的一些具体情况进行分析,以供参考。
Inner Mongolia Harlan Energy 2×330 MW Cogeneration Project A standard section is the first main standard section of the construction and installation project contracted by Dier Group Co.Ltd..It is the the largest comprehensive projec undertaken by this company.Doing a good job in the field construction management organization plays an important role in the successful completion of the project.This paper mainly analyzes some specific conditions encountered in the field construction for reference.
作者
王怀涛
WANG Huai-tao(Dier Group Co.Ltd.,Jining 272073,China)
出处
《工程建设与设计》
2019年第8期56-57,共2页
Construction & Design for Engineering
关键词
330MW机组
施工准备
问题解析
330MW unit
preparations for construction
problem analysis