摘要
电分相改移施工在铁路既有电化改造中,受到停电天窗时间有限、工序复杂、作业范围受限、安全环境差及质量要求高等诸多不利条件的影响,施工完毕能够保证电力机车正常通行。论文结合磁窑站接触网电分相改移施工对电分相改移施工技术进行了探讨和分析。
The electric separation phase shift construction is affected by many unfavorable conditions,such as limited time of blackout skylight,complicated working procedure,limited operation scope,poor safety environment,high quality requirement and so on,in the existing electrification transformation of railway.The completion of the construction can ensure the normal passage of electric locomotives.In this paper,the construction technology of electric separation phase shift is discussed and analyzed in the light of the construction of electric separation phase shift in magnetic kiln station.