摘要
攀枝花到大理总发枢纽互通工程具有土石方开挖量大,地质条件复杂,雨季夜间降雨时间长特点。通过攀枝花至大理高速公路总发枢纽互通工程实例,介绍边坡治理在攀西复杂地质区施工特点、工艺流程及工艺参数,为边坡治理在复杂地质区的应用提供参考。
The Panzhihua-Dali general development interchange project has the characteristics of large amount of excavation of earth and stone,complicated geological conditions and long rainfall time during the rainy season.Through the example of the interchange project of Panzhihua-Dali expressway headquarters,this paper introduces the construction characteristics,process flow and process parameters of the slope management in the complex geological area of Panxi,and provides reference for the application of slope treatment in complex geological areas.