期刊文献+

跨孔阻尼比测试的原理与方法及其在核电厂地基测试中的应用 被引量:2

The principle and method of crosshole seismic test and its application in the investigation of nuclear power plants
下载PDF
导出
摘要 本文概括了岩土体阻尼比测试的各类方法,重点说明了跨孔阻尼比测试的测试原理与方法,结合核电厂岩土工程勘察工程实践,提出了具体的跨孔阻尼比测试技术要求。工程应用与分析表明,跨孔阻尼比测试为破碎岩体及强风化岩体阻尼比的测试提供了一种行之有效的测试方法,可以测定地基小应变情况下的材料阻尼比,在核电厂地基岩土工程勘察中具有广阔的应用前景。 All kinds of the ground damping ratio testing methods are summarized in the paper.The principle and procedures of damping ratio test by crosshole seismic method is described.The test requirements of damping ratio test by crosshole seismic method are specified for nuclear plant investigation work.The engineering practice and analysis shows that the crosshole seismic test is an effective method to determine the damping ratio of fractured and highly weather rock,and which is suitable for ground damping ratio test under small strain conditions.
出处 《工程勘察》 2015年第3期89-95,共7页 Geotechnical Investigation & Surveying
关键词 阻尼比 跨孔法 地基 核电厂 damping ratio crosshole test ground nuclear power plant
  • 相关文献

参考文献9

二级参考文献82

共引文献88

同被引文献16

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部