摘要
如何有效解决水下深基坑内结构施工问题,降低施工难度和成本,是施工中的重点。本文着重介绍了钢吊箱在水下深基坑工程中的应用中的控制要点和注意事项,根据施工进度控制各阶段施工要点,确保其各项性能满足工程施工需要,并为今后类似工况下的施工提供了参考和依据。
how to effectively solve the underwater construction in deep foundation pit structure, reduce the construction difficulty and cost, construction of key. This paper introduces the control points and application of steel boxed cofferdamunder water in deep foundation pit engineering and matters needing attention in the construction schedule control,according to the various stages ofconstruction, to ensure that its performance meets needs of engineeringconstruction,and provides the reference and the basis for the future construction of similar conditions.
出处
《工程经济》
2014年第6期49-52,共4页
ENGINEERING ECONOMY
关键词
钢吊箱
安装
拆除
steel hanging box
installation
demolition