41m/200t箱梁墩顶现浇横移架设施工技术 被引量:1

Construction Technology for 41m/200t Box Girders Casting-in-Place on the Pier Top and Traverse Eracting
下载PDF
导出
摘要 结合贵阳市政工程跨贵黄路盖板桥41m 200t箱梁施工受场地空间限制的难题,采取墩顶现浇+横向滑移等手段进行综合处理,成功地实现了23片重达200t的41m箱梁的安全施工,取得了显著的经济效益,为该方法在类似工程中的应用提供了成功范例。 Based on the technical problems of 41m 200t box girders with limited construction site in Gui-Huang Road in Guiyang,integrated treatment of casting-in-place on the piertop and traverse eracting was taken,successfully achieved the 23 boxes weighing up to 200t of 41m safe construction beams. Construction was achieved successfully and safely,making significant economic benefits and providing a successful example of the application of approach in similar project and having great practical value.
出处 《广东土木与建筑》 2014年第4期58-61,37,共5页 Guangdong Architecture Civil Engineering
关键词 箱梁 墩顶现浇 横向滑移 门洞支架 box girders casting-in-place on the piertop traverse eracting scaffold with corridor
  • 相关文献

参考文献5

二级参考文献5

共引文献7

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部