摘要
介绍两个工程实例均采用自平衡法和传统抗拔法对同类型桩进行基桩抗拔试验,受检桩均发生了极限破坏,结果表明自平衡法在基桩极限抗拔承载力试验中的有效性,并反映出该法对场地要求低、节省工期等优越性。
In this paper,two examples,self-balanced method and tradition lifting method were all used in pile lifting tests and piles were all damaged,were list. It was be illustrated that self-balanced method is effective to get ultimate bearing capacity of piles and is superior in space required and time required.
出处
《广东土木与建筑》
2014年第5期32-34,共3页
Guangdong Architecture Civil Engineering
关键词
自平衡法
荷载箱
桩基抗拔
传统抗拔法
self-balanced method
load cell
lifting test of pile
tradition method of pile lifting